CCTG 第 81 分册第2 卷——废水净化设施的设计与施工

目录
第 1 章概述 ··················································································· 17
第1.1 条:应用范围 ························································································· 17
第1.2 条:施工内容 ························································································· 18
1.2.1. ································································································· 18
1.2.2. 各施工项目 ················································································ 18
第1.3 条:位置和入口.管网连接 ·········································································· 20
第1.4 条:施工中的安全问题 ············································································· 21
第1.5 条:地块的地质工学特征 ·········································································· 22
第1.6 条:环境束缚 ························································································· 22
第1.7 条:原有工程 ························································································· 24
第1.8 条:待处理废水的来源及特征 ···································································· 25
第1.9 条:泥浆、固体废料及其他副产品的用途 ····················································· 26
第1.10 条:质量保证 ························································································ 26
第2 章要求性能 ············································································· 28
第2.1 条:处理质量 ························································································· 28
第2.2 条:处理容量和处理的担保范围 ································································· 29
2.2.1. 处理容量 ··················································································· 29
2.2.2. 处理的担保范围 ·········································································· 31
第2.3 条:设备的适用范围:工作性能保证 ··························································· 35
第3 章设施的设计,项目制定 ··························································· 37
第3.1 条:运行总设计、可靠性和安全 ································································ 37
第3.2 条:分水道、溢洪道和流量分配器 ······························································ 40
第3.3 条:蓄水池或蓄洪池 ················································································ 40
第3.4 条:拦污栅、除沙、除油和其他预处理 ························································ 41
12
第3.5 条:排出物的接收构造物 ·········································································· 42
第3.6 条:升高 ································································································ 42
第3.7 条:凝固、絮凝、化学处理 ······································································ 43
第3.8 条:初级滗析 ·························································································· 43
第3.9 条:生物净化 ·························································································· 44
第3.10 条:消毒 ······························································································ 47
第3.11 条:泥浆的提取、运输和预处理 ································································ 48
第3.12 条:增稠 ······························································································ 48
第3.13 条:稳定 ······························································································ 49
第3.14 条:包装和脱水 ····················································································· 51
3.14.1. 巴斯德氏消毒 ············································································ 51
3.14.2. 化学包装 ·················································································· 51
3.14.3. 热包装 ····················································································· 51
3.14.4. 机械脱水 ················································································ 51
3.14.5. 干燥床 ····················································································· 52
第3.15 条:干燥和灰化 ····················································································· 53
第3.16 条:工程间的联接管道或副产品的排出管道;承压水和排水管道 ······················ 54
第3.17 条:泥浆及设备其它副产品的装卸、贮存和排放 ··········································· 55
第3.18 条:除臭 ······························································································ 56
第3.19 条:测量、校验、调整 ············································································ 56
第3.20 条:电力供给及电力设备 ········································································· 60
第3.21 条:照明 ······························································································ 62
第3.22 条:水的配给和卫生设备 ········································································· 63
第3.23 条:远程通信 ························································································ 64
第3.24 条:试剂、燃料和油的贮存 ······································································ 65
第3.25 条:职工保护和职工安全 ········································································· 65
13
第3.26 条:起重机;工具 ·················································································· 66
第3.27 条:建筑、暖气设备、通风设备 ································································ 67
第3.28 条:办公室、实验室、车间和附属房间 ······················································· 67
第3.29 条:楼梯、地板、舷梯、扶梯、梯子 ·························································· 68
第3.30 条:道路和绿化空间 ··············································································· 68
第3.31 条:围墙 ······························································································ 69
第3.32 条:运营计划和手册 ··············································································· 69
第4 章材料、产品和组成设备的来源及相关规格 ··································· 71
第4.1 条:设备和材料的通用规格 ······································································· 71
第4.2 条:符合标准、无参考标准的情况、厂内技术检查 ········································· 72
第4.3 条:材料、产品和组成设备的质量和试验 ····················································· 73
4.3.1. 骨料 ························································································· 73
4.3.2. 水硬粘结料 ················································································ 73
4.3.3. 钢材 ························································································· 73
4.3.4. 用于混凝土和砖石构成中的其他材料和产品 ······································ 74
4.3.5. 木材 ························································································· 74
4.3.6. 覆盖层和挡板的材料 ···································································· 74
4.3.7. 油漆和防腐保护 ·········································································· 74
第5 章工程的计算和实施 ································································· 76
第5.1 条:工程的计算和实施:概述 ···································································· 76
第5.2 条:挖方和土方工程 ················································································ 76
第5.3 条:地基 ······························································································· 76
第5.4 条:土造蓄洪池 ······················································································ 77
第5.5 条:钢筋混凝土蓄洪池,槽和蓄水池 ··························································· 78
第5.6 条:钢结构 ···························································································· 79
第5.7 条:屋顶和屋面防水 ················································································ 79
14
第5.8 条:涂漆和防腐蚀保护 ············································································· 79
5.8.1. 对构造物的金属部分涂漆 ······························································ 79
5.8.2. 对设备的金属部分涂漆 ································································· 80
第5.9 条:金属设施工程 ··················································································· 80
第5.10 条:电网施工 ························································································ 80
第6 章测试、试验、验收 ································································· 81
第6.1 条:施工中的试验和检查 ·········································································· 81
第6.2 条:水槽和蓄洪池的密封性测试,土造蓄洪池除外 ········································· 81
第6.3 条:管道的密封性测试 ············································································· 82
第6.4 条:泵送设施的测试和试验 ······································································· 82
第6.5 条:自检必需的测量检验 ·········································································· 83
第6.6 条:建筑竣工-试运行:调整期,运转和观察-施工竣工日期: 验收 ······················ 83
6.6.1. 建筑竣工确认 ············································································· 84
6.6.2. 调整阶段 ··················································································· 84
6.6.3. 运转阶段 ··················································································· 85
6.6.4. 观察阶段 ··················································································· 85
6.6.5. 施工竣工日期-验收 ······································································ 86
第6.7 条:质量保证实验的内容及进行方式 ··························································· 88
6.7.1. 质量保证实验的原则 ···································································· 88
6.7.2. 处理质量的检验 ·········································································· 90
第6.8 条:部分实验 ·························································································· 93
6.8.1. 初级沉淀池性能的检验 ································································· 93
6.8.2. 给氧设备性能的检验 ···································································· 94
6.8.3. 净化器性能的检验 ······································································· 95
6.8.4. 污泥脱水系统工作性能的检验 ························································ 96
第6.9 条:噪音测量的实现条件 ·········································································· 97
15
第6.10 条:气味传播测量的实现条件 ··································································· 97